01 / PROJECT SCOPE
Office build-outs and reconfigurations
Office projects may include private offices, conference rooms, reception areas, workstations, partitions, flooring, paint, lighting and power/data coordination. The plan should support the way staff and visitors move through the space.
What to consider: Consider acoustics, privacy, circulation, accessibility, lighting and future flexibility when defining the layout.
02 / PROJECT SCOPE
Retail and customer-facing spaces
Retail and service spaces may need sales areas, counters, display lighting, back-of-house storage, fitting rooms, customer restrooms and durable finishes. Work should align with the business concept and operating requirements.
What to consider: The scope should identify fixtures, signage coordination, power needs and any landlord or center design standards.
03 / PROJECT SCOPE
Interior partitions and finish packages
Partitions, doors, drywall, ceilings, flooring, paint and trim form the visible interior. A coordinated finish schedule helps keep materials, colors and transitions consistent across the space.
What to consider: Rated walls, fire stopping, egress and accessibility requirements must be considered where applicable.
04 / PROJECT SCOPE
Mechanical, electrical and plumbing coordination
Changes in occupancy or layout can affect heating and cooling, ventilation, plumbing fixtures, electrical loads and lighting. These systems should be reviewed early rather than after finishes are installed.
What to consider: Trade providers may need plans, equipment schedules, load information and inspections before work can proceed.
05 / PROJECT SCOPE
Occupied-site and phased construction
Some businesses need to remain open during improvements. Phased work may separate noisy or disruptive tasks, preserve access and coordinate shutdowns around operating hours.
What to consider: The project plan should include site protection, temporary routes, dust control, deliveries and communication with affected occupants.
06 / PROJECT SCOPE
Closeout and turnover readiness
Before handoff, projects may require punch-list corrections, system checks, final inspections, documentation and post-construction cleaning. The closeout scope should identify who is responsible for each item.
What to consider: SOSClean can discuss post-construction cleaning separately as part of the final site presentation, once construction work is complete and the area is safe to clean.